海运航段 · The sea leg

沥青运往中国的海运方案 · The Sea Leg to China: Routing, Timing and Incoterms

A China cargo spends most of its life on water, and almost everything that goes wrong with it is decided before it gets there. This page is about the voyage itself: how the trunk route runs from the Middle East to the Chinese coast and why the northern discharge is the hard one, how to build a schedule backwards from the paving date without treating a quoted transit time as a promise, which Incoterms 2020 rule actually fits the cargo form you are shipping, what the tropical crossing does to drums and to bags, and why the demurrage clock at a Chinese terminal is nearly always started by a document rather than by a ship. What happens after the cargo lands — berths, cargo form and inland distribution — is covered on the ports page rather than repeated here.
FCA / CPT / CIP集装箱适用规则 · Container rules
FOB / CFR / CIF散装海运规则 · Bulk sea rules
≥ 100 °CUN 3257 第9类 · Hot bulk threshold
5 个银行工作日UCP 600 审单期 · Bank examination period
摘要 · Summary

摘要 · Summary

沥青运往中国的航线从中东装港出发,经阿拉伯海、印度洋、马六甲与新加坡海峡进入南海,先抵华南,再沿海北上至华东与北方。越往北航程越长,而施工季越短,排期余量最小的区域恰在最长航段的末端。集装箱货应使用FCA、CPT、CIP,风险在交付承运人时转移;FOB、CFR、CIF是为装船的散装货写的。按2020年通则,CIF只需最低险,CIP须投一切险。热带航段的高温与结露改变的是货物状态而非组分,滞期费则几乎都由单证时点造成。

A China-bound bitumen cargo leaves a Middle East load port, runs out of the Gulf and across the Arabian Sea and Indian Ocean, passes the Malacca and Singapore Straits into the South China Sea, and then works its way up the Chinese coast. The south is the first landfall, the Yangtze delta adds a coastwise leg, and the northern ports add more still — so the sea leg lengthens northward exactly as the usable construction season shortens northward. For containerised cargo the correct Incoterms 2020 rules are FCA, CPT and CIP, because risk passes at handover to the carrier rather than on board the vessel; FOB, CFR and CIF are the sea and inland waterway rules, written for bulk parcels the seller loads himself. Under Incoterms 2020 the CIF insurance obligation is minimum cover while CIP is all-risks. The tropical crossing changes the condition of packed cargo — drum deformation, bag consolidation, condensation — but not its composition, and demurrage at a Chinese terminal is caused on land, by documents, on a clock the sea leg started.

航线 · The route

航线与到港顺序 · The shape of the sea leg, and why the north is the hard one

Before any schedule is useful, it helps to see that all Chinese discharge points sit on a single trunk route and differ only in how far along it the cargo has to travel.

From a Middle East load port the voyage is one long line. The vessel leaves the Gulf through the Strait of Hormuz, crosses the Arabian Sea and the northern Indian Ocean, passes through the Malacca and Singapore Straits, enters the South China Sea and makes its first Chinese landfall in the south. From there the coast runs northeast: the Pearl River delta and the wider Guangdong coast, then the Yangtze delta, then the Bohai Rim and the northeastern gateway beyond it. Nothing about this route is optional or clever. It is the trunk route, and a bitumen cargo shares it with everything else moving between the two regions.

The consequence is that Chinese discharge points are not interchangeable in schedule terms even when they are interchangeable commercially. The southern coast is the nearest, the delta adds a coastwise leg, and a northern discharge adds more again. Freight quotations tend to flatten this into a single line item, which is why the geography is worth holding in mind separately from the rate.

倒挂的地方 · The inversion that makes northern shipments a planning problem

Here is the point this page exists to make, and it is a structural one rather than an operational one. The sea leg gets longer as you go north. The usable paving season gets shorter as you go north. Those two facts move in opposite directions along the same coastline, and they meet at the worst possible place: the region with the least tolerance for a late arrival is the region at the end of the longest voyage.

In the far south there is no closed season to miss, so a late arrival costs money and inconvenience. In the northeast the season is the shortest on the coast, and a cargo landing after it has closed is late by a season rather than by days. The ports and terminals page sets out region by region what the cargo does once it lands and when each season opens and closes, and the climate zone page covers how the same geography drives grade selection. What belongs here is the routing consequence, and it is the part that gets missed.

Because northern buyers position material ahead of the opening rather than drawing it against demand as it appears, the northern arrival window is not only short, it is crowded. Everyone on that coast wants the same weeks. That is precisely when space on the services and connections feeding the north is least elastic, when a rolled booking is most expensive, and when a missed relay is least likely to find a quick alternative. The asymmetry is worth stating in one line: a southern shipment that misses a sailing waits for the next one, while a northern shipment that misses a sailing has to compete for it. A schedule built for the north therefore needs slack for a reason that has nothing to do with the weather at the destination.

直达还是中转 · Direct call or relay, and why the distinction is not cosmetic

A great many Middle East origins have no direct service to the specific Chinese port a buyer wants. The box is relayed at a hub instead: discharged, held in a yard, and loaded onto a connecting vessel. A quoted transit time frequently describes the trunk leg and treats the relay as though it were a moment rather than a stage.

It is not a moment. A transhipment introduces a second discharge, a yard dwell whose length depends on the connection frequency, a second loading, and a second vessel whose schedule was never the one you were shown. A missed connection does not add hours; it adds the interval to the next sailing on that connection, which on a thin service can be substantial. A coastwise or feeder leg to a smaller discharge port is the same thing again, with its own cut-offs.

The practical instruction is short. Before comparing two freight offers on transit time, ask which named service each one uses, what its rotation is, and how many relays the box goes through. Two offers with the same headline number can describe a direct call and a double relay, and those are not the same shipment.

货物形态跟着航段走 · The voyage argues for one cargo form over another

The sea leg has an opinion about packing, and it is worth stating separately from the receiving end's opinion. Packed cargo — new steel drums, jumbo or poly bags, or a bitutainer — travels cold and solid, is counted rather than gauged, stores through a closed season and is indifferent to a slow relay in schedule terms. Hot bulk in a heated tanker has to stay hot for the entire voyage, which means the sea leg is a heating period and a longer transit is a longer heating period. That distinction runs through the rest of this page: for packed cargo, transit time is a cost; for hot bulk, transit time is a specification variable.

航段构成 · Timeline stages

从生产到可用的各段 · The stages a China shipment is actually made of

This table exists so that a transit time can be planned rather than quoted. It deliberately carries no durations, because the only honest figures are the ones the carrier publishes for the named service on the sailing you are actually booking, and the ones your own operation can evidence. What it does give is every stage that has to be added, who controls it, and what makes it move.

The stages between a produced batch and a usable tonne at a Chinese site. Durations are project-specific and are not stated here.
阶段 · Stage发生了什么 · What happens什么决定其长短 · What sets its length谁能控制 · Who controls it
生产与检验 · Production and testingThe batch is produced and tested against the standard the contract namesWhich JTG E20-2011 lines were ordered — wax content by T 0615, ductility by T 0605 at both temperatures, and the RTFOT or TFOT residue block are the ones an ASTM-built certificate does not already carrySeller, but only once the buyer has stated the quality class and the climate zone
灌装与包装 · Filling and packingDrums or bags are filled, closed and prepared for stuffingPacking format, lot size, and whether new steel drums are being sourced rather than drawn from stockSeller
前程内陆段 · Inland leg to the load portCargo moves from the filling point to the container terminal or berthDistance and haulage availability at originSeller under FCA, CPT, CIP, FOB, CFR or CIF
截止时点 · Port cut-offsVerified gross mass, documentation and cargo cut-offs all fall before the vessel's departureThe carrier's published cut-offs for that specific sailingThe carrier. These are not negotiable at the gate
海上主航段 · The ocean legThe vessel runs the trunk route to the first Chinese call or to a relay hubService rotation, vessel speed and the number of intermediate callsThe carrier
中转停留 · Transhipment dwellThe box is discharged at a hub, waits in the yard and loads onto a connecting vesselConnection frequency on that hub pair. A missed connection waits for the next sailing, not for the next tideThe carrier
沿海支线 · Coastwise or feeder legOnward movement from a hub to the actual discharge portFeeder frequency to that port, and its own cut-offsThe carrier
等泊 · Waiting for a berthThe vessel arrives and queuesCongestion, weather, and typhoon suspension in the southern seasonNobody. This is the stage that belongs in the slack
卸货与堆场 · Discharge and yard dwellThe box is discharged and sits in the terminal until it is collectedTerminal throughput, and the free time that was agreed at bookingFree time is set at booking, which is the only point at which anyone controls it
清关 · ClearanceThe declaration is filed and the cargo is releasedWhether the document set was complete and internally consistent before the vessel arrivedBuyer and customs broker
目的地内陆段 · Inland deliveryThe cargo moves to the plant, the store or the tankDistance inland. Packed cargo travels cold and has no radius; hot binder has to arrive hot and therefore doesBuyer
熔化与卸料 · Melting or decantingPacked cargo is melted before the first tonne can be usedThe receiver's melting capacity against the tonnage landedBuyer
A transit time in a freight offer is normally port to port on a nominal rotation. It contains the ocean leg, sometimes the relay and sometimes the feeder, and none of the other nine stages. Subtracting it from a required-on-site date does not produce a sailing date. Build the schedule stage by stage instead, ask the carrier for the named service and its rotation, and treat the result as a planning input with a spread around it rather than as a commitment. Where a specific arrival carries real consequence — the last compactable weeks of a northern season — the slack belongs in the plan, not in the freight rate.
排期 · Scheduling

排期倒推 · Planning the shipment backwards from the paving date

Every China schedule that survives contact with reality is built from the end. The sailing date is an output of this sequence, never an input to it.

1. 先固定第一次摊铺日期 · Start from the date the binder must be usable, not from a sailing

The only genuinely fixed point in the calendar is when the material has to go down on site. Everything upstream is derived from it. Ask the buyer for that date explicitly rather than for a shipment window, because a shipment window is already somebody's arithmetic and you cannot check arithmetic you were not shown. In the north this date is bounded by the season closing; in the far south it is bounded only by the project.

2. 加回收货端的准备时间 · Add the receiving end back in

The discharged tonne is not the usable tonne. Drums and bags have to be de-stuffed and melted, and a melter has a throughput that a container ship does not care about. Hot bulk needs the shore tank ready, heated and with room in it. This stage is invisible in most schedules because it happens after everyone in the logistics chain has stopped counting.

3. 加清关与目的地内陆段 · Add clearance and the inland leg

Clearance is quick when the document set is complete and every document says the same thing, and it is slow exactly once, for one of the reasons set out in the document timing table further down this page. Add the inland leg honestly: packed cargo travels cold and can go as far as the road goes, while hot binder has to arrive hot and so has a real delivery radius.

4. 加到港、等泊与堆场 · Add arrival, berth and yard

A vessel arriving is not a cargo available. Berth congestion, a typhoon warning in the southern season, and the terminal's own yard rhythm all sit between arrival and collection. This is the part of the schedule nobody controls, which is precisely why it is the part that needs the slack.

5. 加海上航段与中转 · Add the ocean leg and every relay

Ask which named service the booking is on, what the rotation is, and how many transhipments the box goes through. Direct versus relay changes this stage more than vessel speed ever will, and a relay on a thin connection is a stage in its own right rather than a rounding error. If the discharge port is served by a feeder, that leg has its own cut-offs and its own frequency.

6. 最后加生产与检验 · Add production and the test schedule last — it is longer than sellers expect

This is where China-bound schedules break most often. A Chinese acceptance table asks for lines that a routine export certificate does not carry: wax content by JTG E20 method T 0615, ductility at 10 °C as well as at 15 °C, the penetration index, and the residue block after RTFOT or TFOT. Those tests have to be commissioned, and commissioned on the material actually being shipped rather than on a data sheet. Ordering them after the booking is the single most common way to miss a sailing. The 70# page sets out which lines apply.

7. 把余量放进计划,而不是放进运价 · Put the slack in the plan, not in the freight rate

A schedule with no slack will meet a wet fortnight, a typhoon suspension, a missed connection or a bank query, and it will lose. Buying an earlier sailing is almost always cheaper than storing, financing and insuring a cargo across a closed northern season, and far cheaper than explaining to a contractor why the binder is not there. Slack is a commercial decision taken at the start, not an excuse offered at the end.

贸易术语 · Incoterms 2020

贸易术语决定了航段上的什么 · Which Incoterms 2020 rule fits the cargo, and what that choice decides about the voyage

The eleven-rule walkthrough belongs on the Incoterms page and the container-securing argument belongs on the containerised shipment page. What belongs here is narrower and more useful: get the rule right for the cargo form in three sentences, then look at what the choice actually does to the four things this page is about — the relay, the waiting, the storage and the clock.

Incoterms 2020 contains eleven rules in two families. Seven — EXW, FCA, CPT, CIP, DAP, DPU and DDP — are for any mode or modes of transport. Four — FAS, FOB, CFR and CIF — are the rules for sea and inland waterway transport, written for cargo the seller himself places on board a named vessel. FOB, CFR and CIF fit a bulk parcel pumped hot into a tanker, where the seller controls the cargo right up to the moment it crosses into the ship and delivery and loss of control are the same moment. For containerised cargo the correct rules are FCA, CPT and CIP, because a sealed box is handed to the carrier or the terminal days before it is loaded, and risk should pass at that handover rather than at the ship. They map one for one: FCA for FOB, CPT for CFR, CIP for CIF. The containerised shipment page argues that case at length and the Incoterms page works through all eleven rules and the cost allocation. Everything below is about what the choice then does to a China voyage in particular.

一、谁订舱,谁就定了免箱期 · The rule decides who negotiates the free time, and it is rarely the party who ends up paying for it

This is the link between the Incoterm and the demurrage section further down, and on this lane it is where the money goes. Under FCA and FOB the buyer contracts the carriage, so the free time at the Chinese terminal is a term in the buyer's own booking. Under CPT, CIP, CFR and CIF the seller contracts the carriage — and the free time in that booking is a term the seller agreed, at a terminal where the buyer will be the one watching the clock. A seller optimising a freight rate has no reason to buy free time he will never use, and no way of knowing how long the buyer's clearance and inland leg will actually take. The remedy is not a different Incoterm. It is a line in the sale contract stating the minimum free time the seller must obtain, agreed while the booking is still being placed, because once the box is on the ground in a Chinese terminal nobody is negotiating anything at all. Sold CIP or CPT, ask what free time is in the booking before the vessel sails. Sold FCA, remember that you were the one who bought it.

二、中转是卖方选的,风险却在买方 · Under CPT and CIP the seller picks the routing and the buyer carries it

Now read the two halves of CPT and CIP together against the relay problem described above. Risk passes at handover to the first carrier, at origin. Carriage is contracted and paid by the seller, all the way to the named destination. So the seller chooses the service, the hub and the number of transhipments — while every hour the box spends in a relay yard, and every consequence of a missed connection, falls on the buyer's side of the risk line. That is the deliberate design of the rules rather than a defect in them, but the consequence is concrete: a buyer on CPT or CIP terms who never asked which service the cargo was booked on has delegated a routing decision that he, and not the seller, is exposed to. Ask for the named service and its rotation at contract stage, not when the cargo is somewhere it should not be.

三、CIF与CIP的保险不是同一份 · The insurance is where the mapping breaks

CIP is not CIF with a different label, and this is one of the most consequential differences in Incoterms 2020. Under CIF the seller's insurance obligation is minimum cover — Institute Cargo Clauses (C) or a similar named-perils wording. Under CIP the obligation is all-risks cover, Institute Cargo Clauses (A) or similar. Both require the policy to be for at least 110 % of the contract price, in the currency of the contract, and to allow the buyer to claim directly. Set that against the damage this particular route produces: drums deformed under stack load after weeks in the equatorial band, seams and closures opened, water ingress from condensation, handling damage in a relay yard. A named-perils policy responds to a list of events; an all-risks wording responds to the loss. A buyer who accepts CIF on a containerised China shipment has taken the wrong transfer point and the narrower policy in the same three letters. Either party may agree wider cover than the rule obliges, but it has to be written in, because what the rule obliges is what applies by default.

四、保险的时间边界 · Where the cover stops, which on a Chinese inland leg is a real question

An Incoterm obliges the seller to insure. It says nothing about the policy lasting as long as the cargo journey does, and that gap is worth opening on a China shipment specifically. The Institute Cargo Clauses transit clause runs cover on a warehouse-to-warehouse basis but terminates it at whichever comes first of delivery at the named destination and the expiry of a stated period after discharge from the overseas vessel. Now set that against the two delays this page keeps describing — a container held through a clearance query and a yard dwell, and an inland leg that in this market can run deep into a provincial hinterland. It is entirely possible for a cargo to be uninsured through the last and roughest part of its journey while both parties assume that CIP is still working. The terminating events and the period are in the policy wording rather than in the three letters on the invoice, so the thing to read is the policy that was actually issued.

五、FCA、提单与时间 · Why the on-board bill of lading question is a scheduling question here

Sellers resisted FCA for one concrete documentary reason. A documentary credit normally calls for an on-board bill of lading, which can only be issued once the cargo is loaded — and under FCA that is after delivery has already taken place, so the seller had performed but could not obtain the document the bank required. Incoterms 2020 supplies an optional mechanism: the parties may agree that the buyer instructs the carrier to issue an on-board bill of lading to the seller once the goods are loaded. It is optional, it has to be written into the sale contract and reflected in the credit, and it depends on the carrier being willing to issue on those instructions; the containerised shipment page sets out how the provision works. The reason it appears on a page about the sea leg is timing rather than law. On a lane where the voyage can outrun the documentary chain, any term that inserts an extra step between loading and the issue of the bill of lading is a term that eats the margin before free time starts running at the other end. Decide it at contract stage and the margin stays; discover it at loading and it does not.

六、DDP进中国 · A term to be careful with

DDP makes the seller responsible for import clearance in the destination country, which for China means being the party that files the declaration and carries the import VAT position at 13 %. A foreign seller with no registered presence generally cannot do this, and an arrangement improvised through a third party is a risk the buyer inherits without ever seeing it. Unless there is a genuine, named structure behind it, DDP into China is a term to decline rather than to price. The HS code and clearance page covers what the importer of record actually has to do.

写法 · How to write it

Name the rule, name the place precisely enough that a reader could stand in it, and name the edition: CIF China is not a term of sale, while CIF [named discharge port], Incoterms 2020 is. Then check the two things this page has added to the standard advice — what free time the carriage contract obtains, and where the insurance cover ends relative to the inland leg — and check that the rule still matches the cargo form actually booked, because a contract that begins as drums and converts to bulk has quietly changed which family of rules it belongs to.

术语对照 · Rule comparison

六个规则在这条航线上的后果 · The six rules read against the voyage rather than against the textbook

A rule-by-rule comparison of delivery points exists on the Incoterms page. This table asks a different question of the same six rules: once the choice is made, who is left holding the routing decision, the free time and the waiting? Read the fourth and fifth columns, which are the ones that decide what a China shipment costs after it has arrived.

The three sea rules and their three any-mode counterparts, read for what each one decides about routing, free time and waiting on a China voyage.
规则 · Rule适配的货物形态 · Cargo form it fits风险转移点 · Where risk passes谁订运输合同 · Who contracts the carriage — and so owns the routing and the free time在中国航段上的实际后果 · What that means once the cargo is on the water
FOBBulk parcels the seller loads on board. A sea and inland waterway ruleWhen the goods are placed on board the vessel at the named port of shipmentBuyer. The relay count and the free time at destination are terms in the buyer's own booking, which is the cleanest position to be inCorrect for a hot parcel into heated tankage. On a container it leaves the seller carrying risk through days of terminal custody he cannot enter, inspect or influence
CFRBulk, as FOBOn board at the port of shipmentSeller, to the named destination port — but risk has already passed to the buyer at the ship's railRight for bulk. On a container it is FOB's risk gap plus a routing the buyer did not choose, and prepaid freight changes neither of those
CIFBulk, as FOB and CFROn board at the port of shipmentSeller, carriage and insurance to the named destination portRight family for bulk. On a container it combines the wrong transfer point with minimum cover — Institute Cargo Clauses (C) or similar, at least 110 % of the contract price in the contract currency — which is the worst available combination on a hot, relayed route
FCAAny mode. The container answer to FOBAt handover to the carrier at the named place, which is where the seller actually stops controlling the cargoBuyer. Free time, the named service and the number of relays are all the buyer's to check before the box movesThe cleanest allocation for drums and bags, provided the documentary question is handled: where the credit requires an on-board bill of lading, the optional Incoterms 2020 mechanism has to be written into the contract before loading
CPTAny mode. The container answer to CFRAt handover to the first carrier, at originSeller, to the named destination. The seller therefore picks the service, the hub and the number of transhipmentsCost and risk part company by design. Every relay dwell, every hour in an unshaded hub yard and every missed connection lands on the buyer's side of the risk line, on a routing the seller selected
CIPAny mode. The container answer to CIFAt handover to the first carrier, at originSeller, to the named destination, with insurance. Same routing and free-time position as CPTAll-risks cover — Institute Cargo Clauses (A) or similar, at least 110 % of the contract price in the contract currency — which is the wording that answers deformation, wetting and handling damage. The rule most drummed and bagged China cargo should move on. Check when the policy's transit cover ends against the length of the inland leg
Three things to carry away, and only the first of them is in the textbooks. First, the rule follows the cargo form: bulk in a heated tanker belongs in the left-hand family, drums, bags and tank containers in the right-hand one, and CIF and CIP are not the same insurance. Second, whoever contracts the carriage decides the routing and the free time, and on CPT, CFR, CIF and CIP that is the seller while the consequences are the buyer's — so the sale contract, not the Incoterm, has to state the minimum free time and give the buyer sight of the named service. Third, an Incoterm allocates cost, risk and obligations only. It does not transfer title, decide the payment method, settle the quantity or quality basis, or say one word about demurrage. Those belong in the clauses around it. DDP is absent from this table because a foreign seller generally cannot act as importer of record into China.
途中受热 · Heat in transit

热带航段 · The equatorial stretch of the route, and which stage of it actually does the damage

How packing fails in heat is covered on the drummed and containerised pages. The question this page can answer that they cannot is a routing question: which part of a China voyage imposes the thermal load, how the routing choice changes it, and what none of it can touch.

The route to China is a hot route for a defined portion of its length, and that portion is the part worth planning around. From the Arabian Sea the track runs down toward the equator and the box stays in that band through the northern Indian Ocean, the Malacca and Singapore Straits and the lower South China Sea, before the coast turns northeast and the air cools. Thermal exposure on this lane is therefore not really a property of the cargo or of the packing at all. It is a property of how many days the box spends in that band, where it is stowed while it is there, and how long it stands still in the middle of it — and of those three, only the third is decided by anything a shipper chooses.

最热的一段是中转堆场,不是船上 · The relay yard, not the ocean leg, is the peak exposure

A container at sea is in a stack, shaded on several sides, in moving air, over water. A container in a transhipment yard is standing on concrete, in still air, frequently with no shade at all — and the hubs that serve this route sit close to the equator. The stage of the voyage with the highest thermal load is usually not the ocean leg. It is the dwell in the relay yard: the stage whose duration nobody quoted, which does not appear in a port-to-port transit time, and which lengthens by a full sailing interval rather than by a few hours when a connection is missed.

That has a consequence worth stating plainly, because it is not obvious from a freight comparison. A routing decision taken purely on rate is a thermal decision taken by accident. Two offers with the same headline transit time, one direct and one double-relayed, expose the cargo very differently even though the paperwork treats them as equivalent. Where the cargo is packed material bound for a receiver who needs discrete units at the melter, a direct call can be worth paying for on grounds that have nothing to do with speed.

The second variable is the stow, and nobody controls it. A box on an exposed top tier in direct sun sees far more heat than one below deck. Under-deck stowage can be requested and noted on the booking; it cannot be guaranteed, which is a reason to pack for the worst case rather than for the requested one.

不会发生的事 · What the heat does not do

Bitumen does not run out of a drum at these temperatures, and it is worth saying so before describing what does go wrong, because the alarmed version of this story circulates widely. Under JTG F40-2004 the softening point requirement for 70# is a minimum of 46 °C for A级, and for 50# a minimum of 49 °C for A级. Softening point is a consistency reference point, not a melting point — the binder becomes progressively soft and deformable long before it is anything like liquid. Nor does the heat of a voyage meaningfully age packed bitumen: oxidative ageing is driven by the temperatures of plant mixing and hot storage, which are in an entirely different range. A tropical crossing changes the condition of packed cargo, not its composition.

决定损害的是时长与昼夜循环,不是峰值温度 · Duration and cycling do the damage, not the peak

What arrives damaged is the product of exposure multiplied by time, and of the day-night cycle repeated. Three things follow from that, and a longer or more heavily relayed routing does not add new ones — it simply adds repetitions.

  • Drums deform. A drum holds its shape partly because its contents are stiff; soften the contents and the lower tiers are carrying the stack. Bulging at the chime, slumping out of round and stressed closures and seams are the result. None of it is a specification failure and most of it is not a product loss, but deformed drums are slow to de-stuff, they generate condition claims, and they are what a receiving surveyor photographs.
  • Bags consolidate. Bags do not deform, they merge. Pressed together under stack load in a hot box, twenty discrete one-tonne units can arrive as one mass that no longer separates. The certificate is untouched; the problem lands entirely at the melter, and therefore in the receiving-end stage of the schedule set out above.
  • The box rains on its own cargo. Moisture already inside evaporates through the hot day, condenses on the cold steel roof at night and drips back down. Over weeks that rusts drum seams and closures and wets bag surfaces, and where a closure has already been stressed it opens a path into the product.

Only one of those three is measurable on a certificate, and it is the last: water content by ASTM D95 is limited to a maximum of 0.2 vol % on a typical export specification, and free water in a drum causes foaming and a genuine safety hazard when the material is heated at destination. The controls for all three belong at origin and to the packing decision rather than to the voyage — the drummed cargo page covers fill, ullage, closures and why reconditioned drums fail this test, and the containerised shipment page covers load distribution, securing and stack height inside the box. What this page adds is the reason to take those decisions differently for a long, relayed, equatorial routing than for a short direct one, and the point in the process at which the routing is still changeable.

散装的情况正好相反 · For hot bulk, the voyage is not exposure — it is the ageing

Everything above concerns cargo that travels cold. A bulk parcel travels hot by design, and that inverts the analysis. The binder is held at temperature from the load port to the shore tank, so the sea leg is a heating period and a longer voyage is a longer heating period. That is oxidative ageing, and the Chinese acceptance table records it: mass change after RTFOT or TFOT must stay within ±0.8 %, and the retained penetration ratio must be at least 61 % for 70# A级. A binder that arrives already part-aged has spent some of its service life on the water.

Two consequences follow for a bulk shipment that do not apply to a packed one. Transit time becomes a technical variable to be discussed with the specification, not only a commercial one to be discussed with the freight. And the carriage condition sets the regulatory status: bitumen carried at or above 100 °C is UN 3257, Class 9, elevated temperature liquid, which changes the transport document, the marking and which carriers will accept it. Solid packed bitumen is generally not handled as a dangerous good. Neither blanket claim — always dangerous, never dangerous — survives contact with a real booking. The bulk cargo page covers the form itself.

海运不改变的东西 · The one thing the voyage cannot touch

Routing, stowage, transit time and packing all act on the condition of the cargo. None of them acts on its composition. Wax content is set by the crude slate, and JTG F40-2004 caps it by the distillation method T 0615 at 2.2 % for A级, 3.0 % for B级 and 4.5 % for C级. If a cargo is going to fail a Chinese acceptance test on wax, it was going to fail before it was loaded, and choosing a shorter route or a cooler stow does nothing whatever about it. That is a load-port problem and it is solved at the load port, or it is not solved at all.

滞期 · Demurrage

滞期费与滞箱费 · Demurrage, detention, and the documents that cause them

Three different charges are routinely called by one name, and separating them is the first step to not paying any of them. None of them is really about the sea.

三笔费用,三个时钟 · Three charges, three different clocks

Three charges get called by one name. 滞期费 demurrage is charged by the carrier while the box remains inside the terminal beyond free time. 滞箱费 detention is charged by the carrier once it has left the terminal and has not yet come back as an empty. 堆存费 terminal storage is charged by the terminal itself for the yard space it occupies — it is additional to the carrier's demurrage and it is not covered by free time negotiated with the carrier, so a shipper who negotiated generously on one and never asked about the other has solved half the problem. The logistics page covers how these charges are structured generally. Bulk runs on a different mechanism again: laytime and demurrage arise under the charterparty as a daily rate on the vessel from the tendering of notice of readiness, governed by the charterparty rather than the bill of lading, and the sums are not comparable. What follows is the part specific to this lane — not what the charges are, but why the clock starts at all.

免箱期是订舱时谈的,之后再也谈不了 · Free time is negotiated at booking, and never afterwards

This is the single most useful sentence in this section. Free time is a commercial term agreed when the booking is placed, at a moment when the carrier wants the cargo and the shipper has alternatives. Once the box is on the ground in a Chinese terminal with a clock running, the shipper has no alternatives at all and the carrier knows it. Free time accepted as offered, without being checked against the buyer's realistic clearance and inland time, is a term agreed by somebody who was not going to pay for it — which, as the Incoterms section above sets out, is exactly the position on CPT, CIP, CFR and CIF terms, where the seller places the booking and the buyer watches the clock. On those terms the free time has to be fixed in the sale contract, because by the time it matters the two parties are on opposite sides of an ocean.

为什么滞期几乎总是单证造成的 · Why the cause is nearly always a document

Demurrage is charged for time, so it feels like a transport problem. It very seldom is. The cargo arrived; that part worked. What failed is on land, and it is usually paper.

This trade lane has a structural trap that deserves stating on its own. The voyage from a Middle East load port to southern China can be completed faster than a documentary chain can be. A bill of lading has to be issued, couriered to a bank, examined, released against payment or acceptance, and couriered onward to the buyer — and each of those steps has its own calendar. The vessel does not wait for any of them. The result is a cargo on the ground with no document to release it against, free time expiring, and nobody having done anything wrong except plan the two chains independently of each other.

The fixes are known and each has a cost:

  • Telex release, or surrender of the originals at origin, so that release at destination does not depend on a courier.
  • A sea waybill, where no document of title is needed. This is clean and fast — but a sea waybill cannot satisfy a documentary credit that calls for a bill of lading, so choosing it is a decision about the payment structure rather than about the shipping document.
  • An electronic bill of lading, where the carrier and both banks support the platform in question. Support is not universal and has to be confirmed rather than assumed.
  • Presenting a clean set first time. Under UCP 600 a bank has up to five banking days following presentation to examine the documents. A discrepancy sends the set back and starts another cycle, and two cycles can consume more time than the ocean leg had left.

一致性 · Consistency is the other half of it

The second family of causes is not late paperwork but inconsistent paperwork. Every document in the set has to describe the same cargo in the same words: goods description, HS heading 2713.20 and its full national subheading, net and gross weights, marks and numbers, and the piece count. A packing list showing 80 drums against a bill of lading showing something else is not a typographical matter at a border; it is a query, and a query is dwell.

That consistency is cheap to check at the load port and expensive to establish afterwards, and the standard loading configurations to check it against — how many units and what net weight belong in a 20-foot box for each packing — are set out on the containerised shipment page. Two things in particular are worth confirming against them before the box is sealed: that the piece count on the packing list is the count that actually went in, and that the drum tare is excluded from the invoiced net weight, because a net weight that quietly includes steel is a discrepancy sitting in the file waiting for a customs officer to find it.

三件在装船前就该完成的事 · Three things to finish before the vessel sails

First, the safety data sheet: a Chinese-market document in GB/T 16483 format with GHS classification under the GB 30000 series, in Simplified Chinese. It is a slow thing to produce properly and an impossible thing to produce quickly once a query has already been raised against a consignment sitting in a yard. The SDS page sets out the format.

Second, the consignee's status. The named consignee has to be a party actually able to file the declaration and act as importer. This is checked before the booking, not discovered at the berth.

Third, the full document set, assembled and cross-checked as a set rather than as a pile. The import documents page lists what belongs in it. Every hour spent on that at origin is bought at the price of an hour; the same hour spent at destination is bought at the price of demurrage, storage and detention running in parallel.

单证时点 · Document timing

时点决定成本 · What has to exist when, and what it costs when it does not

Every row here fails on land, and every row is fixed at origin at a cost of days rather than of charges. The table is ordered roughly by when the deadline falls, which is also the order in which these things get forgotten.

Document and process timing for a bitumen shipment to China, with the failure mode and where the cost lands.
单证或步骤 · Document or step必须在何时完成 · When it has to exist出错的方式 · How it goes wrong成本落在哪里 · Where the cost lands
订舱与免箱期 · Booking and free timeAt booking, before anything movesFree time accepted as offered and never checked against the buyer's realistic clearance and inland timeDemurrage, detention and terminal storage at destination, on terms agreed by a party who was not going to pay them
收货人资质 · Consignee's import standingBefore the booking is placedThe named consignee is not in a position to file the declaration and act as importerThe cargo cannot be cleared by the party it was consigned to, and reconsigning is neither quick nor free
装运前试验与COA · Pre-shipment testing and the Certificate of AnalysisBefore the cargo is committed, not after the bookingJTG E20-2011 lines commissioned late — wax content by T 0615, ductility at 10 °C, penetration index, the RTFOT or TFOT residue blockA missed sailing at best; an acceptance dispute at the destination laboratory at worst
核实总重 VGM · Verified gross massBefore the carrier's VGM cut-off, which falls ahead of departureNo VGM submitted, or a figure that disagrees with the packing listThe container is not loaded and the cargo rolls to the next sailing
化学品安全技术说明书 · Safety data sheetWhile the specification is still being agreedAn English ASTM-format sheet offered in place of a GB/T 16483 document with GB 30000 GHS classification in Simplified ChineseA query raised against the consignment while it sits, and no fast way to answer it
危险品申报 · Dangerous goods declaration, where it appliesAt bookingHot bulk carried at or above 100 °C without being declared as UN 3257, Class 9Refused carriage, or a serious compliance problem discovered at a berth
提单签发方式 · Form of the bill of ladingAgreed in the contract, before loadingA credit requires an on-board bill of lading but the term is FCA without the optional Incoterms 2020 on-board mechanism written inThe seller has delivered but cannot present; payment and release both stall
正本提单到达买方 · Original B/L in the buyer's handsBefore the vessel arrivesThe documentary chain is simply slower than the voyage on this laneCargo on the ground with nothing to release it against, and free time already running
单证与信用证相符 · Documents consistent with the creditAt presentationA discrepancy returns the set; UCP 600 allows a bank up to five banking days to examine each presentationDays consumed while the destination clock is already running
货描与HS编码一致 · Goods description and HS headingIdentical across contract, invoice, packing list, bill of lading and declarationThe description drifts between documents, or HS heading 2713.20 is stated differently in two of themCustoms query, possible inspection, and dwell that nobody budgeted
重量与件数一致 · Weights and piece countAt stuffingDrum tare included in an invoiced net weight, or a piece count that does not match the bill of ladingQuery, re-weighing, dwell, and a credibility problem across the rest of the set
Note what these rows have in common. Not one of them is a shipping failure, and not one of them is expensive at origin. The only row that cannot be repaired later at any price is the first: free time is agreed at booking, and by the time it matters the leverage is on the other side of an ocean. Everything else on this list is a matter of doing the work before the vessel sails rather than after it arrives — which is also the reason the schedule in the steps above adds production and testing last and treats them as the longest stage, not the shortest.
常见问题 · Buyer questions

常见问题 · Frequently asked questions about shipping bitumen to China

按CIP或CPT成交时,中国港口的免箱期是谁谈的?Under CIP or CPT, who actually negotiates the free time at the Chinese terminal?

The seller does, and that is the trap. The Incoterms 2020 rules for containerised cargo are FCA, CPT and CIP, because risk passes at handover to the carrier rather than on board the vessel; FOB, CFR and CIF are the sea and inland waterway rules, written for bulk parcels the seller loads himself. But the rule also decides who contracts the carriage. Under FCA and FOB the buyer books, so the free time at destination is a term in the buyer's own booking. Under CPT, CIP, CFR and CIF the seller books — and he has no reason to buy free time he will never use, and no way of knowing how long the buyer's clearance and inland leg will take. The buyer then watches a clock set by somebody who will not pay for it. The fix is not a different Incoterm but a line in the sale contract stating the minimum free time the seller must obtain, agreed while the booking is still open. Once the box is on the ground in a Chinese terminal, nothing about it is negotiable.

CIP的保险能一直保到内陆工地吗?Does CIP insurance cover the cargo all the way to the inland site?

Not necessarily, and the gap opens exactly where a China shipment is most exposed. Start with what the rules do say: under CIF the seller's insurance obligation is minimum cover, Institute Cargo Clauses (C) or a similar named-perils wording, while under CIP it is all-risks cover, Institute Cargo Clauses (A) or similar. Both require at least 110 % of the contract price in the contract currency, with the buyer able to claim directly — which is why CIF on a containerised cargo takes the wrong risk-transfer point and the narrower policy in the same three letters. What neither rule settles is duration. The Institute Cargo Clauses transit clause runs cover warehouse to warehouse but terminates it at whichever comes first of delivery at the named destination and the expiry of a stated period after discharge from the overseas vessel. Set that against a container held through a clearance query and a yard dwell, then trucked deep into a provincial hinterland, and a cargo can finish its journey uninsured while both parties assume CIP is still working. The period and the terminating events are in the policy wording, not in the Incoterm, so read the policy that was actually issued.

海运到中国要多久?How long is the sea leg to China?

This page deliberately does not answer that with a number, because a number quoted without a named service is not information. What can be said usefully is how to build the answer. Ask the carrier which named service the booking is on, what its rotation is, and how many transhipments the box passes through. That gives the ocean leg, any relay dwell and any feeder leg. Then add the stages either side that a freight quotation never contains: production and the Chinese test schedule, filling and packing, the inland leg to the load port, the cut-offs that fall before departure, waiting for a berth, discharge and yard dwell, clearance, the inland leg at destination, and melting at the receiving end. Treat the total as a planning input with a spread around it, and put slack in the plan rather than in the freight rate.

为什么发往北方港口的排期更难?Why is a northern discharge harder to schedule than a southern one?

Because two things move in opposite directions along the same coastline. The sea leg gets longer as you go north, since southern China is the first landfall on the trunk route and the Bohai Rim and the northeast are the furthest along it. Meanwhile the usable construction season gets shorter as you go north, because hot mix paving stops when the mat can no longer be compacted before it cools. The region with the least tolerance for a late arrival is therefore at the end of the longest voyage. A cargo landing in the north after the season has closed has not arrived late, it has arrived for the following season, and it has to be stored, financed and insured until then. Northern shipments are consequently positioned ahead of the season rather than drawn against demand as it appears.

航程中哪一段对货物最热?Which stage of the voyage actually imposes the heat on the cargo?

Usually the transhipment yard rather than the ocean leg, which is the opposite of what most shippers assume. A container at sea sits in a stack, shaded on several sides, in moving air over water. A container waiting for a connection stands on concrete in still air, often with no shade at all, at a hub close to the equator — and that dwell is the stage no freight quotation states and the stage that lengthens by a whole sailing interval when a connection is missed. So a routing chosen purely on rate is a thermal decision taken by accident, and two offers with the same headline transit time can expose the cargo very differently. What the heat then does is change condition, not composition: bitumen does not liquefy at these temperatures, since the JTG F40 softening point requirement for 70# is a minimum of 46 °C for A级 and softening point is a consistency reference rather than a melting point. Damage comes from duration and from the day-night cycle repeated — drums deforming under stack load, bags consolidating into a mass that no longer separates, and condensation rusting seams and wetting bags. Only the last is measurable on a certificate, through water content by ASTM D95 at a maximum of 0.2 vol % on a typical export specification.

散装和桶装在航程上的区别是什么?Does transit time affect bulk cargo differently from packed cargo?

Yes, and it is the sharpest distinction on this page. Packed cargo travels cold and solid, so a longer voyage costs money and exposes the packaging to more heat and condensation, but it does not change the binder. A bulk parcel travels hot by design and has to stay hot from the load port to the shore tank, which means the voyage is itself a heating period and a longer voyage is a longer one. That is oxidative ageing, and the Chinese acceptance table records it: mass change after RTFOT or TFOT within ±0.8 %, and a retained penetration ratio of at least 61 % for 70# A级. For packed cargo transit time is a cost; for hot bulk it is a specification variable. Separately, bitumen carried at or above 100 °C is UN 3257, Class 9, while solid packed bitumen is generally not handled as a dangerous good.

滞期费到底是怎么产生的?What actually causes demurrage on a China shipment?

Almost never the sea leg. Demurrage is charged for a container sitting inside the terminal beyond the free time agreed at booking, detention for keeping it outside the terminal beyond free time, and terminal storage is a separate charge by the terminal itself that carrier free time does not cover. The cause is nearly always a document. This lane has a structural trap: the voyage from a Middle East load port to southern China can be completed faster than a bill of lading can be issued, couriered to a bank, examined, released and couriered onward, so the vessel beats the paperwork. The fixes are telex release, a sea waybill where no document of title is needed, an electronic bill of lading where the carrier and both banks support it, and presenting a clean set first time — under UCP 600 a bank has up to five banking days to examine each presentation, so a discrepancy cycle can consume more time than the voyage had left. The one thing that cannot be fixed later is free time itself, which is agreed at booking and never afterwards.

海运会改变技术规格吗?Does the voyage change the specification?

No. Routing, stowage, transit time and packing act on the condition of the cargo. None of them acts on its composition. This matters most for wax content (蜡含量), which is set by the crude slate and capped by JTG F40-2004 using the distillation method T 0615 at 2.2 % for A级, 3.0 % for B级 and 4.5 % for C级. If a cargo is going to fail a Chinese acceptance test on wax, it was going to fail before it was loaded, and no choice of route, stow or discharge port changes that by a decimal place. The same applies to flash point, solubility, penetration index and the ductility requirements. The sea leg decides whether the cargo arrives on time and in good condition; the load port decides whether it complies.

QC
How this page is maintainedThis page describes the sea leg of a bitumen shipment to China and deliberately stops at the quay. It names no shipping line, no port of loading, no terminal, no agent and no freight forwarder, states no relationship with any carrier or facility, and quotes no freight rates, no transit times in days and no delivery dates — because a transit time belongs to a named service on a specific sailing and any figure published here would be both a commercial promise and, within a season, wrong. Coastal regions and straits are named as market geography only. The Incoterms references are to the Incoterms 2020 rules published by the International Chamber of Commerce: FAS, FOB, CFR and CIF are the rules for sea and inland waterway transport, EXW, FCA, CPT, CIP, DAP, DPU and DDP are the rules for any mode, the CIF insurance obligation is minimum cover while CIP is all-risks, and both require at least 110 % of the contract price. The Incoterms rules govern only what they say they govern; they do not transfer title, decide a payment method, settle a quality or quantity basis, or say anything about demurrage or free time, and the contract clauses around them must do that work. Where this page describes the duration of cargo insurance it describes the structure of the Institute Cargo Clauses transit clause in general terms only — the terminating events and the period after discharge are stated in the policy actually issued, and no period is asserted here. Documentary credit timing is described from UCP 600. Technical values are cited from JTG F40-2004 and from typical export specification practice with the ASTM method named, and no duty rate is stated anywhere on this page: it must be read off the current tariff schedule for the specific subheading and origin. Nothing here is legal, customs, insurance or regulatory advice — confirm classification with a licensed customs broker, insurance wording with your broker or underwriter, and the applicable Incoterms rule with your own contract counsel. If you find something here that conflicts with the current rules or with current practice, tell us and it will be corrected.

按航程与船期询价 · Request a quotation built around your arrival window

Send the discharge port or province, the cargo form — new steel drums, jumbo or poly bags, bitutainer or bulk — the Incoterms 2020 rule you want quoted, and the date the binder actually has to be usable on site rather than a shipment window. With those the schedule can be built backwards stage by stage, the correct Incoterms rule can be checked against the cargo form before the contract is drafted, and the test schedule can be commissioned early enough not to cost a sailing. If the destination is northern and the season is closing, say so first: that changes the packing recommendation before it changes anything else. Contact is WhatsApp only, +971 56 144 5733.

Send RFQ on WhatsApp
WA
Email enquiry WhatsApp enquiry