"What is your best price?"
The section above sets out why the five missing items make this unanswerable. The useful move, when you are screening several suppliers at once, is to turn the question around. Whoever does send a confident number against a one-line enquiry should be asked which packing, which port and which delivery term that number assumes. Some will produce a coherent set of assumptions, which tells you they priced something real and you can now compare it properly. Others will not be able to say, which tells you the figure was chosen to keep you in the conversation rather than to describe a cargo.
"What is the minimum order quantity?"
The floor is set by how the cargo physically moves, not by a policy number. Containerised material is bought by the container: eighty drums fill a 20 ft unit whatever the fill weight, which puts one container between 12 MT and 14.8 MT drummed, or 20 MT in one-tonne bags. Below a full container there is no shipment to arrange, only a courier problem. Bulk sits at a different scale entirely, because a parcel has to be found on a vessel or a vessel part-chartered around it. Send the quantity you genuinely want rather than a round number chosen to look serious, and the options that exist at that size can be set against it.
"Does this grade meet our project specification?"
Not answerable from a grade name alone. Two binders can share a penetration band and still behave differently, because penetration says nothing about temperature susceptibility or ageing behaviour. Send the specification document. A specification is a list of properties with test methods and acceptance limits, and it can be checked line by line — which is the only form of the answer that is worth having when an engineer has to sign off the material.
"Is bitumen 60/70 the same as VG-30?"
They are compared commercially and cover a similar paving application, but they are measured by different tests under different standards, and a 60/70 cargo does not automatically satisfy a VG-30 specification. Where a project names a grade, supply that grade and have any substitution approved in writing by the engineer. The grade equivalence page on this site sets out the cross-references and, more usefully, their limits.
"What will it cost me landed, including duty?"
Import duty, national subheadings under HS 2713.20, port charges, demurrage terms and inland haulage are destination-specific and are your customs broker's territory rather than the seller's. What can be quoted is a delivery term that puts a defined portion of that chain on the seller — which is exactly what the Incoterm choice is for.
"When can you deliver?"
No delivery date can be given on a web page, and none is given here. A shipment window belongs in an offer that has been built against a defined cargo and a defined route, and then in a contract. Treat a delivery promise made before the cargo is defined as what it is — an unsupported statement made to win an enquiry.
Things you should refuse from any supplier, including this one
- A price with no Incoterm and no validity. It cannot be compared and it cannot be relied on.
- A Certificate of Analysis that predates the cargo. A COA is anchored to an identified lot and to the day the lot was tested. If either anchor is missing, or if the document is older than the production it claims to describe, it is not reporting your material.
- A technical data sheet offered in place of a COA. The first describes what the grade is supposed to be; only the second says what is in the drums you are paying for.
- Reluctance to accept independent inspection. Inspection is a small, quantifiable line that can be shown priced inside the offer. An objection to having a neutral party sample the cargo and publish what it found deserves more weight than anything else said in the negotiation.
- Any change of bank details arriving by message. Verify through a route you initiated before a single transfer is made.