Bitumen Asphaltive · Middle East Supply Desk

Turkey market · EN 12591 (TS EN)

Bitumen Supply to Turkey: EN 12591 Grades, Regional Climate and the Overland Route

Among the markets reached overland from the Middle East, Turkey is the one that procures against the European system. Paving bitumen is specified to EN 12591 as adopted into the Turkish standards catalogue, so the grades are European bands — 50/70 and 70/100 — rather than the ASTM 60/70 idiom used almost everywhere else this site covers. That changes what a certificate has to report: a Fraass breaking point with no ASTM counterpart, ageing to EN 12607-1 rather than ASTM D1754, and the EN test method series throughout. This page sets out the EN requirement structure, how grade selection shifts between a hot Mediterranean south and an eastern plateau that freezes hard at altitude, the land crossings on Turkey’s eastern frontier and the port alternatives, and how the commercial terms change when the cargo arrives on a truck instead of a ship.

EN 12591Paving grade standard
50/70Mainstream grade, warm regions
70/100Softer grade, cold east
CPT / DAPOverland Incoterms 2020 rules

Market summary

Why Turkey reads a bitumen offer differently from its neighbours

Almost every overland market in this part of the world buys penetration grades in the ASTM idiom. Turkey is the exception, and the exception is not cosmetic.

Iraq, Afghanistan, Pakistan, Turkmenistan and the wider Gulf all read an offer written as 60/70 without hesitation. Turkey does not use that designation, because Turkish paving bitumen is specified against EN 12591, Bitumen and bituminous binders — Specifications for paving grade bitumens, the European standard, adopted into the national catalogue by the Turkish Standards Institution and cited with a TS EN prefix. Adoption of a European Norm does not rewrite it; the requirement tables, the grade names and the test methods are the European ones. What that means in practice is that the grade an engineer names is an EN band — 50/70, 70/100, 35/50, 100/150 — and 60/70 is not one of them.

This is a bigger problem than a naming mismatch, because the two systems do not measure the same set of things. An EN certificate carries lines that an ASTM one has no procedure for, and it controls ageing by a different oven test. A supplier who submits a standard Middle East export Certificate of Analysis against a Turkish tender has not submitted a partially complete document; on the properties that matter most in the Turkish winter, the tests were never run.

Above the material standard

EN 12591 defines the binder. It is not, by itself, the document a Turkish contractor works to. State highway work is procured by the General Directorate of Highways (Karayollari Genel Mudurlugu, KGM), which publishes its own highway technical specification governing mix types, layers, binder content, laying and compaction, and which names the acceptable binder grade for each layer. Metropolitan municipalities, airport and industrial developers and private clients each procure against their own documents. Any of these can be tighter than the material standard, and a project may also invoke the EN mixture standards — the EN 13108 series for asphalt specifications and the EN 12697 series for mixture test methods. This page does not quote a specification document number for any of them. Take the operative requirement from the tender in front of you, and confirm which edition it incorporates.

The four things that decide a Turkish order

  • The EN band. Named as an EN 12591 grade, and matched to the region the road is in rather than to national habit.
  • The certificate. Reported to the EN test method series, including the low-temperature line and the EN 12607-1 ageing set. This is where most offers fail.
  • The region. Turkey’s design climate changes by more within its own borders than most bitumen markets differ from each other. A binder that suits Antalya is the wrong choice for Ardahan.
  • The mode. Where the cargo arrives overland across the eastern frontier, the commercial vocabulary is CPT or DAP to a named place, a consignment note rather than a bill of lading, and a truck rather than a container as the unit of quantity.

A note on spelling and on limits

Turkish place names are given here without diacritics so that they survive every character set a buyer might open this page in. More importantly: this page describes geography, specification practice and climate. It does not state that any particular crossing, port or rail service is currently open or available for bitumen, and it does not state transit times, freight rates, duty rates, licensing positions or vehicle capacities. Those are facts of the day, and they belong to your freight forwarder, your customs broker and your own legal and compliance advisers.

The specification spine

EN 12591 and the grade bands Turkey actually names

EN 12591 classifies paving bitumen by penetration at 25 °C, exactly as ASTM does. What differs is where the band edges sit, and what else the standard controls around them.

The EN 12591 paving range runs from the hardest band, 20/30, through 30/45, 35/50, 40/60, 50/70, 70/100, 100/150 and 160/220 to the softest, 250/330. The bands are wider at the soft end and narrower at the hard end, and they are not aligned with the ASTM bands. That is why 60/70 has no home in EN 12591: it sits across the 50/70 and 70/100 boundary, overlapping both and matching neither.

Why 50/70 and 70/100 are the mainstream pair

Two bands carry the great majority of European paving volume, and Turkey is no exception. 50/70 is the general-purpose warm-climate paving grade: stiff enough to resist rutting through a Mediterranean or Aegean summer, workable enough for ordinary hot-mix plant operation. 70/100 is its softer counterpart, chosen where the design risk moves from summer rutting to winter cracking — higher ground, colder provinces, and mixtures where flexibility is worth more than stiffness.

The remaining bands appear at the edges of the range. 35/50 is reached for where sustained heat and heavy, slow-moving traffic make rutting the dominant failure mode, and where the specification permits a harder binder. 100/150 appears in genuinely cold-region work. Harder grades still — 20/30 and 30/45, and the hard paving grades covered by EN 13924-1 — belong to high-modulus base course work rather than to ordinary surfacing.

Two-sided bands, and what that does to acceptance

An EN band is not a floor. 50/70 is accepted between 50 and 70 tenths of a millimetre and rejected at 72, and its softening point is controlled as a range rather than a minimum. A binder can be too soft or too hard for the same grade. This differs from the habit of reading a viscosity minimum or a single-sided requirement, and it makes the measured value on the batch certificate load-bearing rather than indicative.

Where the modified and non-paving products sit

Polymer modified binders are outside EN 12591. They are specified against EN 14023, the framework specification for polymer modified bitumens, which works on a class system rather than fixed values and adds elastic recovery to EN 13398 and storage stability to EN 13399. Cationic bituminous emulsions sit under EN 13808, and cutback and fluxed binders under EN 15322. A paving grade certificate evidences none of these. If a Turkish tender calls for a modified binder or an emulsion, an EN 12591 certificate is the wrong document, not merely an incomplete one.

Technical data

EN 12591 requirement structure for the grades Turkey uses

The four bands below cover almost everything a Turkish project will name, from the hot southeast to the eastern plateau. Read the columns as a family: as the grade softens, the penetration rises, the softening point falls, the permitted mass loss on ageing loosens, the retained penetration requirement relaxes, and the Fraass breaking point requirement gets colder. That last row is the one that has no equivalent anywhere in the ASTM system.

Requirement structure of EN 12591 for the four paving bands most relevant to Turkish work, with EN test methods.
Property EN test method 35/50 50/70 70/100 100/150
Penetration at 25 °C, 100 g, 5 s, 0.1 mm EN 1426 35–50 50–70 70–100 100–150
Softening point, ring and ball, °C EN 1427 50–58 46–54 43–51 39–47
Flash point, Cleveland open cup, °C, min EN ISO 2592 240 230 230 230
Solubility, wt %, min EN 12592 99.0 99.0 99.0 99.0
Change of mass after ageing, %, max EN 12607-1 (RTFOT) 0.5 0.5 0.8 0.8
Retained penetration after ageing, % of original, min EN 12607-1 then EN 1426 53 50 46 43
Increase in softening point after ageing, °C, max EN 12607-1 then EN 1427 8 9 9 10
Fraass breaking point, °C, max EN 12593 -5 -8 -10 -12
Read this table as orientation, not as the acceptance schedule. EN 12591 leaves several requirements to national selection — the Fraass breaking point among them — and offers alternative severity options for others, so the figure a batch is actually judged against is the one printed in the edition of the standard the tender cites, together with any national annex the tender incorporates. Two further points. First, EN 12591 also provides for viscosity requirements to be specified where a purchaser wants them: kinematic viscosity at 135 °C to EN 12595 and dynamic viscosity at 60 °C to EN 12596. Neither is quoted here because the applicable values are a national selection. Second, EN 12591 does not control ductility at all, so its absence from an EN certificate is not a defect. The binding specification for any shipment is the one written into the sales contract and evidenced by the batch Certificate of Analysis.

The certificate

What an EN certificate reports that an ASTM one does not

This is the single most common reason an otherwise sound offer is set aside in Turkey. The problem is not that the numbers are wrong. It is that three of the lines the European system relies on were never measured.

The Fraass breaking point: a low-temperature line with no ASTM counterpart

The Fraass breaking point, measured to EN 12593, is the temperature at which a thin film of bitumen spread on a steel plaque first cracks when the plaque is repeatedly flexed while being cooled at a controlled rate. It is reported as a temperature in degrees Celsius, and the requirement is a maximum — the binder must break no warmer than the stated figure. It is the European system’s answer to the question that penetration and softening point cannot address: how cold can this binder get before it stops behaving as a flexible material and starts behaving as a brittle one.

There is no ASTM equivalent. ASTM approaches low-temperature behaviour through performance grading instead, using the bending beam rheometer, which is a different measurement producing a different number on different equipment. So a certificate produced against an ASTM paving schedule does not carry a Fraass value, cannot carry one, and the value cannot be inferred from penetration, softening point or anything else on the sheet. If the tender requires it, the test has to be commissioned specifically, on the batch, before the material is certified. Discovering the gap after dispatch is expensive; asking for it at the enquiry stage costs a line in an email.

This is not an academic requirement in Turkey. On the Mediterranean coast the Fraass line is met comfortably and nobody thinks about it. On the eastern plateau, where winter minima routinely fall below -20 °C, it is the line that decides whether the pavement survives a season.

EN 12607-1 RTFOT, not ASTM D1754 TFOT

Both systems simulate the ageing a binder undergoes during hot mixing, and they do it differently. ASTM D1754, the thin-film oven test, holds a static 3.2 mm film of binder in a shallow pan on a rotating shelf in a ventilated oven. EN 12607-1, the rolling thin-film oven test, continuously rolls a moving film around the inside of a rotating glass bottle with a jet of air directed into the mouth of each bottle as it passes, so fresh surface is exposed throughout the run. The exposures are not the same, the degree of ageing is not the same, and the results are not interchangeable. ASTM does have a rolling thin-film procedure of its own, ASTM D2872, which is the closer analogue — but it is not what a standard Middle East export certificate normally reports, because the export idiom controls ageing by loss on heating to D1754.

The ageing property ASTM does not control at all

Having aged the binder, EN 12591 measures three things on the residue: the change of mass, the retained penetration, and the increase in softening point. The first two have recognisable ASTM counterparts. The third does not appear in the ASTM paving specification at all. It is a direct cap on how much the binder is permitted to stiffen during mixing, and it catches a failure mode that retained penetration alone can miss. A certificate that reports loss on heating and retained penetration, but nothing about softening point on the aged residue, has left an EN requirement unevidenced.

The rest of the method series

Beyond those three, the EN series maps onto ASTM reasonably closely but never identically. Penetration to EN 1426 and softening point to EN 1427 are procedurally very close to ASTM D5 and D36. Flash point by Cleveland open cup is EN ISO 2592, which replaced the older EN ISO 2592 reference still seen on legacy documents. Solubility is EN 12592 — and here there is a genuine difference of substance, because the EN method determines solubility in toluene or xylene while ASTM D2042 uses trichloroethylene. The results answer the same question about adulteration, but a certificate should say which solvent was used rather than leaving it to be assumed. Density and relative density are EN 15326. And the sampling itself has its own standards: EN 58 for sampling bituminous binders and EN 12594 for preparing test samples. Disputes about a test result far more often turn on how the sample was drawn than on how it was tested, so sampling to the EN procedure, with sealed retained samples held by both parties, is worth writing into the contract.

Cross-reference

EN method against ASTM counterpart, line by line

Use this when you are holding an ASTM-format Certificate of Analysis and need to work out what a Turkish engineer will find missing. The right-hand column is written from that engineer’s point of view.

EN test methods used under EN 12591, their nearest ASTM counterparts, and the practical consequence for a certificate offered into Turkey.
What is measured EN method ASTM counterpart Practical consequence
Penetration at 25 °C, 100 g, 5 s EN 1426 ASTM D5 Procedurally close and directly comparable. What differs is the acceptance band: the EN grade is 50/70 or 70/100, and a batch reported as 60/70 satisfies neither band as a name, whatever the measured figure shows.
Softening point, ring and ball EN 1427 ASTM D36 Comparable. EN controls it as a two-sided range tied to the grade, so a value can be out of specification for being too high as well as too low.
Fraass breaking point EN 12593 None No ASTM equivalent exists. The line will be absent from an ASTM-schedule certificate and cannot be derived from other properties. Commission it specifically if the tender requires it.
Short-term ageing exposure EN 12607-1 (RTFOT) ASTM D1754 (TFOT); ASTM D2872 (RTFOT) EN 12591 ages a moving film in a rotating bottle. D1754 ages a static film in a pan and is not interchangeable with it. D2872 is the closer analogue but is rarely what a Middle East export certificate carries.
Change of mass after ageing EN 12607-1 ASTM D1754 (loss on heating) Both report a mass change, but on residues produced by different exposures. Do not transcribe a TFOT figure into an EN column.
Retained penetration after ageing EN 12607-1 then EN 1426 ASTM D5 on TFOT residue Same concept, different residue. The EN minimum tightens as the grade hardens.
Increase in softening point after ageing EN 12607-1 then EN 1427 Not controlled in the ASTM paving specification A cap on stiffening that the ASTM idiom simply does not carry. Its absence is an unevidenced EN requirement, not a formatting difference.
Flash point, Cleveland open cup EN ISO 2592 ASTM D92 Comparable. EN ISO 2592 superseded the EN ISO 2592 reference that still appears on older data sheets.
Solubility EN 12592 ASTM D2042 Different solvent basis: toluene or xylene under EN, trichloroethylene under ASTM. Both are anti-adulteration checks, but the certificate should name the solvent.
Density and relative density EN 15326 ASTM D70 Comparable. Reported for volume and tonnage conversion rather than as a grade acceptance line.
Kinematic viscosity at 135 °C EN 12595 ASTM D2170 Available in the EN system where a purchaser specifies it. Not a universal EN 12591 requirement, so check the tender before assuming it is needed.
Ductility at 25 °C Not controlled by EN 12591 ASTM D113 The reverse case. An ASTM certificate carries ductility and an EN one usually does not. Its absence from an EN certificate is correct, not a gap.
Sampling and sample preparation EN 58 and EN 12594 ASTM D140 Where a result is challenged, the argument is normally about the sample rather than the test. Specify EN sampling and sealed retained samples in the contract.
One structural point sits behind the whole table. EN 12591 carries an annex tying it to the European construction products framework, and where that framework applies it brings factory production control and conformity marking obligations for binder placed on the market. Whether it applies to your consignment, your supplier and your destination, in what form and under which edition, is a regulatory question whose answer is dated and has changed more than once. This page does not state it. Take your own legal and compliance advice, and put the question to your customs broker in writing before you contract.

Climate and grade

One country, two opposite grade selection arguments

Most bitumen markets have one climate story. Turkey is conventionally divided into seven geographic regions, and two of them pull in flatly opposite directions. The south coast is a hot-climate paving problem in which rutting is the failure being designed against and the top of the specification governs. The eastern plateau is a cold-climate paving problem at altitude in which thermal cracking is the failure being designed against and the Fraass line governs. Both sit inside the same national standard, and a supplier who quotes one grade for the whole country has understood only half the market. What follows is the physical logic of the choice. It is not a statement of what any Turkish specification requires; the grade for a project is the one the tender names.

Turkish climate regions, the failure mode each one drives, and the direction of the resulting grade selection.
Region Climate character What the binder has to survive Direction of grade selection
Mediterranean coast — Antalya, Mersin, Adana, Hatay Hot dry summers, mild wet winters. Coastal winter minima rarely fall far below freezing. Sustained high pavement surface temperature, and rutting under heavy freight on the coastal and port corridors. The high-temperature end governs. A harder band such as 50/70, or 35/50 where the specification permits it. The Fraass requirement is met with room to spare and is not the binding line.
Southeastern Anatolia — Sanliurfa, Diyarbakir, Mardin, Sirnak Among the hottest summers in the country, with genuinely cold but comparatively short inland winters. Extreme summer air and surface temperature, alongside a winter that still reaches well below freezing away from the river valleys. Hardest end of the paving range the specification allows, or a modified binder to EN 14023. The winter is real enough that the low-temperature line cannot simply be ignored.
Aegean coast — Izmir, Aydin, Mugla Mediterranean, marginally milder than the south coast, with a long dry summer. High summer temperature and heavy seasonal traffic; a mild winter. Same logic as the Mediterranean coast with slightly less pressure at the top end. 50/70 is the natural centre of gravity.
Marmara and Thrace — Istanbul, Kocaeli, Bursa, Tekirdag Transitional: warm summers, cool damp winters, repeated freeze-thaw cycling rather than deep cold. Moisture, freeze-thaw at the pavement surface, and very high traffic volume rather than extreme temperature at either end. A mid-range band. This is also the densest concentration of population, industry and traffic in the country, and the point furthest from the eastern land gate, which makes it the region where a supply argument is most often won or lost on logistics rather than on grade.
Black Sea coast — Samsun, Trabzon, Rize, Hopa Mild for the latitude but the wettest part of Turkey, with rainfall in every month and the national maximum in the far east of the coast. Water. Stripping and loss of adhesion between binder and aggregate, not temperature extremes. Grade choice is conventional and mid-range. The specification questions that actually matter here are adhesion, stripping resistance and drainage. Rain, not cold, closes the laying season.
Central Anatolia — Ankara, Konya, Kayseri, Eskisehir Semi-arid continental plateau, broadly 800 to 1,100 m across the main cities, with hot summers, cold winters and a wide daily temperature range. Both ends of the scale within the same year, plus daily thermal cycling that fatigues the binder. This is where a two-sided EN band earns its keep. A mid-range grade, with the Fraass requirement genuinely checked rather than assumed.
Eastern Anatolia — Erzurum, Kars, Ardahan, Agri, Van Severe continental at altitude. Erzurum sits near 1,900 m, Kars and Ardahan near 1,750 to 1,800 m, with prolonged winter snow cover and minima routinely well below -20 °C. Low-temperature cracking, thermal fatigue and freeze-thaw damage through a long winter. The low-temperature end governs, which is the exact inverse of the Mediterranean argument. A softer band such as 70/100, or 100/150 where the specification permits it, with the Fraass breaking point as the line that actually decides acceptance.
Eastern mountains and inner highlands — Erzincan, Bayburt, Gumushane Mountain valleys and high passes; the Kop pass between Bayburt and Erzurum and the Zigana pass on the road to Trabzon both stand above 2,000 m. Altitude cold, snow loading and a construction season compressed at both ends. Softer band, in the same direction as eastern Anatolia. The binding practical constraint is the working season rather than the specification.
Two consequences follow for a supplier. First, a Turkish programme spread across regions may legitimately need more than one grade in the same order, which is a packing and segregation question as much as a commercial one — keep the grades physically and documentally separate, and make sure each batch certificate ties to the drums or the tanker load it actually describes. Second, the low-temperature requirement is the one an ASTM-schedule supplier is least equipped to evidence, and it is precisely the requirement that bites hardest in the eastern provinces. Those provinces are the closest market to the land gate and the most demanding one technically.

Geography

The land route, the port alternatives, and Turkey as a corridor

For a cargo arriving over the eastern land frontier, Turkey is a road market. Understanding it means understanding one crossing, a very long haul west of it, and the fact that the country does not only consume bitumen — it passes it through.

The eastern land gate

The principal road frontier on Turkey’s eastern border is at Gurbulak in Agri province, in the shadow of Mount Ararat and a short distance from Dogubayazit, facing Bazargan across the frontier. It carries the main east-west artery across this frontier, approached through Marand and Maku, and continuing west as part of the European E80 route and the Asian Highway AH1 alignment. It is the longest-established of the road crossings on this frontier and, measured on a map, the shortest approach to eastern Turkey from a Middle East loading point. Whether it is open, and open to this commodity, on your dates is a question for a freight forwarder and not one this page answers.

It is not the only one. Esendere in Hakkari province faces Sero across the frontier, a more southerly and considerably more mountainous crossing. Further north, Kapikoy in Van province faces Razi, and this is where the historic railway alignment running east out of Istanbul reaches the border. Two physical facts about that alignment are worth knowing even if you never touch rail. The first is that the railway is 1435 mm standard gauge on both sides of this crossing, so unlike the 1520 mm broad-gauge corridors to the north this route carries no break of gauge at the frontier — a wagon does not have to be transhipped or have its bogies exchanged to continue. The second is that the alignment has never been physically continuous: it is interrupted by Lake Van, and the gap between Tatvan and Van is designed to be bridged by train ferry rather than by track. A corridor with a built-in break of mode in the middle behaves differently from a continuous one, and that is a planning fact rather than a curiosity. Whether the ferry link, or the line either side of it, is running and available for this commodity is a status question that this page does not answer.

None of this says a route is open, running, or available for bitumen. Border and corridor status changes for reasons that have nothing to do with the cargo, and it cannot be verified from a web page. Confirm the current position with your freight forwarder before you commit to a delivery date.

What the road west actually crosses

The distance from the eastern frontier to the industrial belt around the Sea of Marmara is on the order of 1,700 km, and it is not flat. The route runs across the Anatolian plateau through Agri, Erzurum and Erzincan, over ground that stays high for hundreds of kilometres and crosses passes that carry snow for a substantial part of the year. The Tahir pass east of Erzurum and the Kop pass between Bayburt and Erzurum both sit above 2,000 m; the Zigana pass on the descent to the Black Sea coast is comparable. This matters commercially in two ways. It means the eastern and southeastern provinces are the natural overland market, because they are close to the gate. And it means that a delivery to Istanbul or Izmir is a very long land haul that deserves an honest comparison against a sea option, rather than an automatic assumption in either direction.

The sea options, and where they make sense

Turkey has coastline on four seas and gateways on all of them. On the Mediterranean, Mersin, Iskenderun and Antalya serve the hot southern hinterland and the routes into central Anatolia. Around the Sea of Marmara, the Izmit and Kocaeli area, Ambarli, Gemlik and Derince sit at the centre of Turkish industry. On the Aegean, the Izmir and Aliaga area serves the western provinces. On the Black Sea, Samsun, Trabzon and Hopa serve the northern hinterland and form the coastal link toward Georgia.

The useful way to think about this is not sea against land, but which part of the country each mode reaches efficiently. The overland route through the eastern frontier reaches the east and southeast at short distance and the west at long distance. The sea routes reach the coasts directly and the interior by road. For a programme spread across the country, the sensible answer is often a split, and the comparison should be made on delivered cost to the named place rather than on freight rate alone.

Turkey as a transit country, not only a destination

Turkey sits between the Middle East, Europe and the Caucasus, and a great deal of cargo crosses it without stopping. Westward, the principal road gate to the European Union is Kapikule in Edirne province, facing Kapitan Andreevo in Bulgaria, and it is a long-established heavy-freight crossing. What the waiting position looks like there on any given date is a question for a forwarder, not a figure this page states. Ipsala, facing Kipoi, is the road gate to Greece. Northeastward, Sarp on the Black Sea coast is the coastal road gate to Georgia and the flattest route to the Caucasus, while Turkgozu at Posof in Ardahan province is the inland alternative toward Akhaltsikhe, higher and more exposed in winter. The Baku-Tbilisi-Kars railway alignment runs northeast from Kars through the frontier uplands toward Akhalkalaki in Georgia, where a transhipment and gauge-change facility exists for the simple reason that Turkey works on 1435 mm standard gauge and Georgia on 1520 mm broad gauge. And at Dilucu in Igdir province Turkey meets the Nakhchivan exclave of Azerbaijan at Sadarak. Southward, Habur at Silopi in Sirnak province faces Ibrahim Khalil and is the principal road gate to northern Iraq.

For a buyer this creates two different transactions that look similar and are not. A movement that ends in Turkey is an import, cleared at the frontier, with Turkish requirements applying to the goods. A movement that crosses Turkey is a customs transit, and the requirements that matter are those of the country where it finally clears. Getting these two confused is a documentation failure rather than a logistics one, and it is entirely avoidable by deciding at the contracting stage which one you are doing. Whether a particular transit is permissible, and what licensing or compliance obligations attach to it, is a question for your own legal and compliance advisers and your customs broker — not for a supplier page.

Gateways

Land crossings, ports and onward corridors

Geography only. Nothing in this table states that a crossing, port or rail link is currently open, operating on a schedule, or available for bitumen. Every line is a starting point for a conversation with a freight forwarder, and current status must come from them.

Turkish land frontiers, sea gateways and onward corridors relevant to a bitumen movement arriving overland from the Middle East.
Gateway Where it is What it connects Note for a bitumen buyer
Bazargan / Gurbulak Turkey’s eastern frontier, Agri province, near Dogubayazit below Mount Ararat The main road artery across the eastern frontier, approached via Marand and Maku, continuing west on the E80 and AH1 alignment Measured on a map, the shortest approach to the eastern and southeastern Turkish market from a Middle East loading point. The gate stands at altitude and the road west crosses high ground, so winter routing is a real question. Current status, and whether the crossing is usable for this commodity, comes from a forwarder.
Sero / Esendere Turkey’s eastern frontier, into Hakkari province A southerly road crossing into the southeastern mountains Mountain routing on both sides. Treat as an alternative for a forwarder to assess rather than as a substitute to be assumed.
Razi / Kapikoy Turkey’s eastern frontier, Van province The rail alignment of the historic eastbound route out of Istanbul, with an adjacent road gate The railway is 1435 mm standard gauge on both sides of this crossing, so this alignment carries no break of gauge at the frontier. It does carry a break of mode: the line is interrupted by Lake Van, and the gap between Tatvan and Van is designed to be bridged by train ferry rather than by track. Whether the ferry link or the line is running, and whether either is available for any specific commodity, is a forwarder question.
Kapikule / Kapitan Andreevo Turkey to Bulgaria, Edirne province The principal road gate between Turkey and the European Union Where a transit movement bound for Europe leaves Turkey, and a long-established heavy-freight crossing. Ask the forwarder what the waiting position is on your dates; no queue, schedule or status is stated here.
Ipsala / Kipoi Turkey to Greece, Edirne province A second road gate into the European Union The western alternative to Kapikule.
Sarp Turkey to Georgia, Artvin province on the Black Sea coast The coastal road route to Georgia and onward to the wider Caucasus The flat option to the Caucasus, avoiding the interior passes. Relevant when Turkey is the transit leg.
Turkgozu / Vale (Posof) Turkey to Georgia, Ardahan province An inland road route toward Akhaltsikhe Higher and more exposed than Sarp, which makes it primarily a winter routing question.
Kars to Akhalkalaki (BTK alignment) Northeastern Turkey, running from Kars through the frontier uplands into Samtskhe-Javakheti in Georgia The Baku-Tbilisi-Kars railway alignment toward Georgia and Azerbaijan Rail geography, not a service guarantee. Note the permanent break of gauge at Akhalkalaki: Turkey works on 1435 mm standard gauge and Georgia on 1520 mm broad gauge, so a through movement means transhipment or bogie exchange. Whether a commodity can move on it, and on what terms, is entirely a forwarder question.
Dilucu / Sadarak Turkey to Azerbaijan, Igdir province Turkey’s short frontier with the Nakhchivan exclave Relevant only where Turkey is the transit country rather than the destination.
Habur / Ibrahim Khalil Turkey to Iraq, Silopi in Sirnak province The principal road gate to northern Iraq Relevant where the final destination is Iraq and Turkey is the corridor.
Mersin, Iskenderun, Antalya Mediterranean coast Sea gateways serving the hot southern hinterland and the routes into central Anatolia The natural discharge points for the southern market, and the sensible comparison when part of a programme moves by sea.
Izmit and Kocaeli, Ambarli, Gemlik, Derince Sea of Marmara The Turkish industrial core and the conurbation around it The furthest point from the eastern land gate, and therefore where the overland argument is weakest and a sea option deserves a genuine comparison.
Izmir and Aliaga Aegean coast The western provinces Serves the Aegean market directly and the western interior by road.
Samsun, Trabzon, Hopa Black Sea coast The northern hinterland, and by road the link toward Georgia Trabzon and Hopa function as the coastal connection toward the Caucasus as well as Turkish discharge points.
Access to heated bulk storage at any of the sea gateways above is a commercial arrangement with a terminal operator, never a default capability implied by the name of a port. The same is true inland: a road tanker can only be discharged where the receiver has heated tankage, a discharge connection and a pump. Confirm the receiving facility before a bulk movement is contracted, not after the vehicle is loaded.

Overland terms

What changes when the cargo arrives on a truck

Almost every commercial habit built around sea freight is wrong for a land movement, and the errors are not subtle. Work through these before the contract is drafted rather than after the vehicle is loaded.

Quote the right Incoterms rule

FOB, CFR, CIF, FAS and CFR-family terms are sea and inland waterway rules. They refer to a ship’s rail, a port and a bill of lading, none of which exist on a road movement. For carriage by truck the Incoterms 2020 rules that fit are FCA, CPT, CIP, DAP, DPU and DDP, each followed by a named place rather than a named port. Writing FOB against a truck delivery is a drafting error that stays invisible until the moment something goes wrong, and then decides who pays for it.

Expect a consignment note, not a bill of lading

There is no bill of lading on a truck. The transport document is a road consignment note, and where the CMR Convention governs the movement, the CMR note is that document. It is evidence of the contract of carriage and of receipt of the goods, but it is not a document of title, so it cannot be used the way a bill of lading is used to control release of cargo. A letter of credit drafted around presentation of a bill of lading cannot be satisfied by a road movement. Decide the payment mechanism around the mode, and have your bank confirm the document set before the contract is signed.

Fix packing around the truck, not the container

Overland, the unit of quantity is a vehicle load, not a twenty-foot container. The published container figures remain useful for comparison — 150 kg steel drums give 80 drums and 12 MT per 20′ FCL, 180 kg drums give 80 drums and 14.4 MT, 185 kg drums give 80 drums and 14.8 MT, and jumbo or poly bags of 1 MT give 20 bags and 20 MT — but they do not govern a truck. What governs a truck is the permitted gross and axle weight in each country it crosses, and the vehicle itself. That payload figure comes from the haulier, on the day, for the specific vehicle. Do not let a container table set the tonnage in a contract for a road delivery.

Decide bulk against the receiver’s capability, not the distance

A heated road tanker is genuinely practical over a land leg in a way it is not over a long sea passage, because the binder spends far less time in transit and the temperature management problem is correspondingly smaller. It is only practical, however, if the receiving plant has heated storage, a discharge connection and a pump. There is also a transport classification question: carriage of a liquid at or above 100 °C brings the elevated temperature substance provisions into play, under which such a load is classified as UN 3257, elevated temperature liquid, n.o.s., Class 9, in the UN model regulations from which the European road transport rules are drawn, with consequences for vehicle, equipment, driver and documentation. Confirm applicability and the resulting requirements with the carrier and with your own compliance adviser before assuming bulk is the cheaper option.

Plan the border, not the port

Customs formalities at the land gate replace port clearance as the thing that goes wrong. Where goods cross a customs territory without being imported into it, the movement runs under a customs transit procedure rather than an ordinary clearance, and the TIR system exists precisely to let a sealed road vehicle do that on a single document against an internationally backed guarantee. Whether TIR or some other instrument is available for your movement, with your carrier, on your dates, is for the carrier and a licensed customs broker to confirm in writing; nothing here states that any of it applies. The practical variables are documentation completeness, correct and consistent goods description, weighbridge results and seal integrity — and the queue. Keep the goods description word for word identical across the contract, the invoice, the packing list and the transport document, because a description that drifts between documents is the most common self-inflicted cause of a hold.

Treat winter as a routing decision

The road west of the eastern frontier crosses high ground for hundreds of kilometres and passes above 2,000 m that carry snow for a substantial part of the year. Snow closes and reopens routes at short notice, and the eastern provinces that are the natural overland market are also the ones with the shortest paving season. Build float into the delivery window, ask the forwarder what the winter routing looks like on the day, and do not price a date you cannot control.

Settle specification and inspection before dispatch

Write the test schedule into the contract to the EN method series: penetration to EN 1426, softening point to EN 1427, flash point to EN ISO 2592, solubility to EN 12592, and the full EN 12607-1 ageing set including the increase in softening point. If the tender requires a Fraass breaking point to EN 12593, say so at the enquiry stage so the test is commissioned before the batch is certified. Require a batch-specific Certificate of Analysis with measured values rather than a typical-values data sheet, specify sampling to EN 58 with sealed retained samples held by both parties, and where drums are used specify them explicitly as new steel drums.

Buyer questions

Frequently asked questions about bitumen supply to Turkey

Which bitumen grades does Turkey use?

European bands under EN 12591, adopted into the Turkish catalogue with a TS EN designation. The paving range runs from 20/30 through 30/45, 35/50, 40/60, 50/70, 70/100, 100/150 and 160/220 to 250/330, and in practice two bands carry most of the volume: 50/70 as the general-purpose warm-climate paving grade and 70/100 as the softer choice for colder and higher ground. 35/50 appears where sustained heat and slow heavy traffic make rutting the dominant risk, and 100/150 in genuinely cold-region work. Polymer modified binders sit outside EN 12591 under EN 14023, emulsions under EN 13808 and cutbacks under EN 15322.

Is bitumen 60/70 acceptable against a Turkish specification?

Not under that name. EN 12591 has no 60/70 band; the designation straddles the boundary between 50/70 and 70/100 and matches neither. A batch measured at 62 dmm is inside the 50/70 band by penetration and could be offered as 50/70, but the penetration figure alone does not make the certificate responsive, because the EN specification also controls the softening point as a two-sided range, controls ageing by EN 12607-1 rather than ASTM D1754, caps the increase in softening point after ageing, and may require a Fraass breaking point that no ASTM schedule produces. Get the batch tested to the EN method series and offered against a named EN band, rather than relabelling an ASTM certificate.

What is the Fraass breaking point, and will an ASTM certificate show it?

It is the temperature at which a thin film of bitumen on a steel plaque first cracks while the plaque is repeatedly flexed and cooled at a controlled rate, measured to EN 12593 and reported in degrees Celsius as a maximum. It is the European system’s low-temperature control, and it is the property that matters most on Turkey’s eastern plateau, where winter minima routinely fall below -20 °C. An ASTM certificate will not show it, because ASTM has no counterpart test — the ASTM route to low-temperature behaviour is the bending beam rheometer within performance grading, which is a different measurement on different equipment. The Fraass value cannot be inferred from penetration or softening point. If the tender requires it, commission the test specifically before the batch is certified.

Is EN 12607-1 the same as ASTM D1754?

No. EN 12607-1 is the rolling thin-film oven test: a moving film of binder is rolled around the inside of a rotating glass bottle with an air jet directed into it, exposing fresh surface throughout. ASTM D1754 is the thin-film oven test, which ages a static film in a shallow pan in a ventilated oven. The exposures differ, the degree of ageing differs, and the results are not interchangeable. ASTM D2872 is the ASTM rolling thin-film procedure and is the closer analogue, but it is not what a standard Middle East export certificate normally carries. There is also a property difference: EN 12591 caps the increase in softening point on the aged residue, and the ASTM paving specification does not control that at all.

Why would the grade differ between the Mediterranean coast and eastern Anatolia?

Because the two regions are designing against opposite failure modes inside the same national standard. On the Mediterranean coast the summer is hot, the winter is mild and the risk is rutting, so the argument runs toward the harder end of the range and the low-temperature line is met without effort. In eastern Anatolia the road sits at altitude — Erzurum near 1,900 m, Kars and Ardahan near 1,750 to 1,800 m — under prolonged snow cover with minima well below -20 °C, and the risk is thermal cracking, so the argument runs toward the softer end and the Fraass breaking point becomes the line that decides acceptance. It is unusual for one country to contain both arguments this strongly, and it means a national programme may legitimately need more than one grade. The grade for any given project is the one the tender names.

What changes commercially when bitumen arrives overland instead of by sea?

Most of the vocabulary. There is no ocean freight, no bill of lading, no container, no port demurrage and no laytime. The transport document is a road consignment note, which is not a document of title, so a letter of credit built around a bill of lading cannot be satisfied. The unit of quantity is a vehicle load rather than a twenty-foot container, and the payload is set by permitted gross and axle weights and by the vehicle itself rather than by a container loading table. Customs formalities at the land gate replace port clearance as the principal risk to schedule. Transit is short enough to plan in days rather than weeks, which lets a buyer order closer to need — but the actual figure depends on routing, queueing and season and has to come from a freight forwarder, not from a page like this one.

Which Incoterms rule should we use for a road delivery into Turkey?

One of the rules written for any mode of transport: FCA, CPT, CIP, DAP, DPU or DDP, each followed by a named place. FOB, CFR, CIF and FAS are sea and inland waterway rules built around a ship, a port and a bill of lading, and none of those exist on a truck movement. For an inland Turkish delivery, CPT or DAP to a named place is the natural pair — CPT where carriage is paid to a point and risk passes earlier, DAP where the goods are placed at the buyer’s disposal ready for unloading at the destination. Whichever you choose, name the place precisely, including the specific facility where the vehicle will discharge.

Can a cargo transit Turkey onward to Europe or the Caucasus?

Turkey is geographically a corridor as well as a destination. Westward the principal road gate to the European Union is Kapikule in Edirne province facing Kapitan Andreevo in Bulgaria, with Ipsala facing Kipoi in Greece as the second option. Northeastward, Sarp on the Black Sea coast is the coastal road gate to Georgia, Turkgozu at Posof is the inland alternative, the Baku-Tbilisi-Kars railway alignment runs northeast from Kars toward Akhalkalaki in Georgia, where a permanent break of gauge sits between Turkey’s 1435 mm standard gauge and Georgia’s 1520 mm broad gauge, and Dilucu in Igdir province meets the Nakhchivan exclave of Azerbaijan. Southward, Habur at Silopi faces Ibrahim Khalil for northern Iraq. That is geography; it is not a statement that any of these is open, running, or available for a given cargo. Commercially the important distinction is that a movement ending in Turkey is an import while a movement crossing it is a customs transit, and the two carry different documentation. Whether a particular transit is permissible, and what licensing, sanctions or compliance obligations attach to it, is a matter for your own legal and compliance advice and your customs broker.

QC
How this page is maintainedGrade designations, requirement values and test-method references are given as published in EN 12591 and the associated EN test standards, and are provided for technical orientation and commercial discussion. EN 12591 leaves several requirements — the Fraass breaking point among them — to national selection and offers alternative severity options for others, so the operative figures for any project are those in the edition of the standard the tender cites, together with any national annex and any highway authority or municipal specification layered above it. European standards are periodically revised. Geography on this page is descriptive: border crossings, ports, rail alignments, passes and altitudes are named because they are public and verifiable, but nothing here states that a route or facility is currently open, operating, or available for bitumen, and current status must be confirmed with a freight forwarder. This page states no transit times, freight rates, vehicle capacities, duty rates, conformity-marking positions or trade-restriction positions; those require your own customs, legal and compliance advice. The binding specification for any shipment is the one written into the sales contract and evidenced by the batch Certificate of Analysis. If you find a value on this page that conflicts with a current standard, tell us and we will correct it.

Request a quotation for delivery to Turkey

Send the EN 12591 band you need — 50/70, 70/100 or another — together with tonnage, packing, the named place of delivery and the Incoterms 2020 rule you want quoted. State the province the material is going to, because that decides whether the high-temperature or the low-temperature end of the specification governs, and say whether the tender requires a Fraass breaking point to EN 12593 so the test can be commissioned before the batch is certified rather than after. If you have the specification extract, attach it and the offer will be checked against it line by line. Contact is by WhatsApp on +971 56 144 5733.

Send RFQ on WhatsApp

WA

Email enquiry WhatsApp enquiry