Sellers of drummed bitumen are asked for a price per tonne. The honest answer is that there is no single price per tonne until the packing is fixed, because the binder is usually the part of the cost that varies least. The same tonne of the same grade, from the same production, lands at a materially different cost depending on how much of it goes into each drum, whether the drums are palletised, which Incoterms rule is quoted, and which certificates have to be produced. Settle those first and the commercial conversation becomes short.
Grade, and the standard it will be judged against
Name the grade and name the standard the cargo will be tested against: ASTM D946 for penetration grades, EN 12591 where a European specification governs, IS 73:2013 where a viscosity grade is required, AASHTO M320 for performance grades. Two cargoes both described as 60/70 can be presented against different test suites, and the acceptance decision at destination is made against the standard, not against the label on the drum. If a project specification or a national road standard governs, attach it to the enquiry so the offer is checked against it before it is priced rather than after the container has sailed.
Net tonnage, and whether it can move to whole containers
State tonnage as net bitumen, excluding drum tare and all packing. Then say whether the figure is firm or whether it can be rounded to a whole number of containers. A 20-foot container of drums carries 12.0, 14.4 or 14.8 MT of product and nothing in between, so an order of 100 MT becomes seven containers of 185 kg drums — 103.6 MT of booked capacity, of which 3.6 MT is paid for and carries nothing — or nine containers of 150 kg drums, where 8 MT of the 108 MT booked is empty space on a paid slot. Buyers who can flex tonnage by a few per cent ship cheaper per tonne than buyers who cannot, and the flexibility costs nothing to offer.
Drum net fill weight
150, 180 or 185 kg net. This one line moves landed cost more than most negotiations on the product price, because two separate cost layers move with it at once. At 150 kg you buy 6.67 drums for every tonne of bitumen; at 185 kg you buy 5.41 — about 19 % fewer pieces of steel, fewer closures, fewer stencils and fewer drums to open at the other end. At the same time the container slot carries 14.8 MT instead of 12.0 MT, so the freight spread over each tonne falls in the same proportion. The case for the 150 kg drum is handling: it is lighter to move by hand at a site with no forklift or drum clamp, and easier to split among small end users. Decide it on the equipment at the delivery point, not on the price sheet.
New drums, stated as new
Write the packing as new, unused, first-use steel drums; reconditioned, reprocessed or previously used drums not acceptable. A contract that says only "steel drums" is satisfied by a reconditioned drum, and the price difference between the two is exactly the kind of gap that makes one offer look sharper than another for reasons that have nothing to do with the binder. State the head type as well. Paving, oxidized and polymer modified grades set solid at ambient temperature and are therefore always supplied in a removable-head drum (1A2 in the UN packaging nomenclature, dimensioned in the ISO 15750 series), because a solid binder cannot be poured out through a two-inch bung. The tight-head drum (1A1) with bungs appears only for the grades that stay liquid at ambient temperature, which in practice means cutbacks and emulsions. Construction detail, steel gauge and closure types are covered on the technical page for bitumen in new steel drums.
How the drums travel inside the box
Palletised or floor loaded, decided before stuffing because it cannot be changed afterwards. Palletised drums discharge far faster and can be moved by a plain forklift; floor loading avoids the pallet cost and the pallet weight, and fits the drums more tightly against each other. If wooden pallets are used, the cargo falls under ISPM 15 and the pallets must be treated and marked, which is a border problem rather than a preference — untreated wood packaging is turned back at a number of destinations.
Drum marking
Ask for grade, net weight, tare weight, batch or lot number, production date and country of origin stencilled on every drum, and say if a particular language or format is required. Origin marking on the package itself is a customs requirement in several import markets, and it is far cheaper to have it applied at the filling line than to have a container held at the discharge port while it is applied by hand.
Destination, Incoterm and the named place
Give the discharge port or the inland delivery point, and the Incoterms 2020 rule with the named place spelled out in full. "CIF" on its own is not a term of delivery; "CIF named port of destination" is. Comparing an FOB offer against a CFR offer without converting both to the same basis is the most common way buyers reach the wrong conclusion about which supply is cheaper.
Documents, inspection and payment
Say which certificates you need, whether the certificate of origin requires chamber or embassy legalisation, and whether a destination conformity assessment programme applies — schemes of that type operate in a number of import markets and add both cost and lead time. Say who appoints the pre-shipment inspector and, critically, what the inspection scope covers. Then give the payment structure and the shipment window, so the offer is built on terms you can actually execute.